Skip to content
Condor Speed Shop E30 Front Subframe Reinforcement Install Procedure

Condor Speed Shop E30 Front Subframe Reinforcement Install Procedure

Installation instructions for the Condor E30 Front Subframe Reinforcement plates. Make sure all areas that are to be welded are clean and ready to weld.

1. Place the Front Swaybar Reinforcements on top of the subframe, making sure the bolt holes are lined up and weld.

2. Install the Inner Engine Mount Reinforcement next. They need to be installed and welded on the underside of the subframe.

3. Install the Outer Engine Mount Reinforcements Last. They also need to be installed and welded on the underside of the subframe.

Purchase E30 Front Subframe Reinforcements

Previous article Condor E46 Weld-in Reinforcement Installation Tips
Next article Condor Speed Shop Engine Riser Kit Installation Instructions

Leave a comment

Comments must be approved before appearing

* Required fields